Sinotruk Howo 8 ton Garbage compactor truck Chassis configuration: Sinotruk original chassis, wheelbase 3.8 meters, Sinotruk Howo light truck white cab, 120 horsepower engine in the cloud, 6-speed gearbox, power steering, air brake, 750 tires with spare tires.
Sinotruk Howo 8 ton Garbage compactor truck Bodywork configuration: Compressed volume of 8 cubic meters, made of T420 special steel plate integrally bent, equipped with Xiamen Yinhua hydraulic cylinder oil leakage replacement, Changyuan 50 hydraulic pump, Zhongmei multi-way valve, Siemens PLC control, electro-optical switch, 2 sewage Collection box, 3 operation control boxes, with night light, equipped with two-way compression function, the two-way hydraulic lock does not leak water.
Sinotruk Howo 8 ton Garbage compactor truck Optional configuration: optional double pump confluence + double valve control, optional hanging bucket rack, triangle bucket, fully sealed bucket, swing arm device, 120-140 barrels of garbage can be installed, and the power is large.
Specification of Howo Truck | ||
General Parameter | Drive model | 4x2 LHD |
Curb Weight | 16000KGS | |
Approach/Departure angle | 18/15 | |
Overall Dimensions | 9080×2300×3250 | |
Wheel Base | 5000 mm | |
Overhang (front/rear) | 1240/2540 | |
Leaf Spring | 11/11+7 | |
Tire Quantity | 6 | |
Tire Type | 8.25R20 | |
Max. Driving Speed | 95km/h | |
Cab | Passenger | 3 person |
Gearbox | 5 shifts | |
Engine Parameter | Engine Model | WD615.87 |
Fuel | Diesel | |
Intake Type | Vertical, vertical, water cooling, four strokes | |
MAX Power | 290 hp | |
Emission standard | Euro 3 | |
Cylinder Number | 4 | |
Cylinder Arrangement | In-line | |
Rated Speed | 1800rpm | |
Displacement | 4.257L |
Specification of 10cbm garbage compactor box | ||
Upper Parameter | Tanker body material | Q235A |
Shape | rectangular box | |
Thickness | Side: 4mm, bottom: 4mm | |
Payload capacity | 10 m³ | |
Equipment | Equipped with dustbin, hydraulic system and operating system Equipped with two advanced double acting hydro cylinders One vehicle can cooperate with several dustbins to improve the ability of cycle operation. cycling time60s |
|
System of loading | Mechanized, rear loading | |
Loading bunker | Volume | 1.5 m3 |
Operation control system | Electrically hydraulic control | |
Lifting capacity | ≥800 kg | |
Liquid drain | Drainage channel, sewage tank | |
Working zone Lighting | 2 lamps | |
Mechanism of raising | Two hydraulic cylinders | |
Ensuring tightness | Between the body and lifting back part in the lower part profile acid-proof rubber is used. | |
Pressing system | Pressure | 16Mpa |
Compaction ratio | 1:4 | |
Loading cycle | 25-30 second | |
Unloading cycle | 15-20 second | |
pressing mechanism | The giving plate and hinge related pressing plate moving on two directing bars | |
Pressing mode | Automatic pressing | |
Control of pressing | Control from the external panel on the bunker | |
Selective configuration | PLC electric automatic control, multifunctional rear lifting part, rear handrail and footplate, other shapes of body, rear swing arm, and etc. |